The Making of PETRONAS

The people, agreements and public choices behind Malaysia’s petroleum wealth

By Dr Shamsul Bahar Abdul Kadir

On 21 March 1978, a shipping rate stood between Malaysia and the signatures it needed to build a liquefied natural gas business. In the Dewan Rakyat, Oo Gin Sun asked whether PETRONAS and Shell had settled their differences over Bintulu. Prime Minister Tun Hussein Onn explained that PETRONAS, Shell and Mitsubishi had initialled the joint-venture and construction-service agreements on 31 January. They were still negotiating with the Malaysia International Shipping Corporation over the price of carrying the gas. The three agreements, he told the House, were a “package deal”.1

It was a remarkably precise answer to a question about national ambition. A shipowner had to recover the cost of a vessel built for one kind of cargo. The buyer in Japan cared what the gas would cost when it arrived. The Malaysian partners needed enough left over to pay for the plant in Sarawak. They could agree on the ownership of the company and on who would build its plant, and still fail to agree on a business worth undertaking. The freight rate joined the three calculations.

Five years to the day after that exchange, Parliament returned to Bintulu. Malaysia’s first LNG cargo for Japan had sailed. On 21 March 1983 Ling Siew Ming asked what the people of Sarawak would gain from the industry. The written reply counted Sarawakians in senior jobs, identified the value on which the state’s cash payment would be calculated and pointed to a deepwater port. Between Oo’s question and Ling’s lies the history of how a petroleum resource became Malaysian wealth. The people who negotiated the terms, learned to operate the business and decided what to do with its earnings shaped how much of that wealth Malaysians could keep.2,3

Ask how PETRONAS grew so big so quickly, and someone will say, “It’s in its DNA.” I think the answer takes us back to a choice Malaysians made before the company existed. Who could commit the country to a petroleum policy, and who would have to make a business of it? Within a little over two years PETRONAS had secured production-sharing terms with the oil majors. Within nine, Malaysia was shipping gas to Japan. Seventeen years after incorporation, PETRONAS signed for exploration acreage in Vietnam. Those are three different kinds of growth. The place to look for their beginnings is in the institution Tun Razak’s government chose to build, and in the people trusted to run it.2,4,5,6

I came to this history by another route. In September 1978 my father, Abdul Kadir Shamsuddin, told my two brothers and me that he wanted to write his memoirs. He spoke of decisions in which civil servants had taken part and of how little the public knew of their work. He died two months later. When we came to the biography, the family had only a handful of his work notes. My sister Noorlina had, however, kept other people’s words. A reporter who covered my father’s remarks about oil negotiations, a colleague who worked for him and the Japanese executives who were counting on Bintulu each saw a different part of the enterprise. Their accounts help recover the work my father wanted Malaysians to understand.7

1  What Malaysia inherited

When Miri No. 1 began producing in 1910, it yielded about 83 barrels of oil a day. Local people already knew what oil was good for. Around Miri they had skimmed it from shallow pits for lighting and for use on boats. Commercial production added a refinery, tanks, workshops and a pipeline to ships offshore. It also brought different kinds of work into the same town. In the accounts examined by historian Sridevi Menon, the company’s 1917 payroll of 827 omitted the contract carpenters, builders and riveters listed separately. An oilfield could support more households than its employment roll suggested. A young Dayak worker or a Chinese carpenter could help build the industry while having little say in the next investment it made.8

Sarawak brought that industrial history into Malaysia in 1963. By 1968, West Lutong was producing oil offshore. Surveying the seabed, hiring a rig and drilling a well that might prove dry required capital on a scale few local institutions could command. The concessionaires supplied it. They also held much of the geological information and could choose between spending their next exploration dollar off Borneo and sending a rig elsewhere. Oil prices rose sharply in 1973–74. For a government trying to finance development across a federation, the resulting question concerned both the money and the power to decide when a field would be developed.8,9,10

Prime Minister Tun Abdul Razak Hussein and Tengku Razaleigh Hamzah had discussed a national oil company before that price shock. Malaysia already had experience putting a vital energy industry in national hands. A generation of engineers had been learning to run power stations, extend transmission lines and supply towns and factories. Some of the people who knew that experience best would soon be asked what it took to build an oil company.9,11

Before oil, the electricity board

The Federation of Malaya’s Central Electricity Board began in 1949 as a statutory utility with 34 power stations. In 1965 it became the National Electricity Board of the States of Malaya (NEB). Tenaga Nasional Berhad (TNB) succeeded it in 1990. The board helped electrify the peninsula, while Sarawak had a separate utility whose installations passed to the Sarawak Electricity Supply Corporation under its 1962 ordinance. The NEB and PETRONAS were two leading examples of public enterprise in energy. One had to keep a grid supplied each day. The other would have to persuade producing states, international operators and overseas buyers to enter long commitments.12

For a manufacturer deciding where to open a factory, a growing national grid meant access to power on a scale that a local generator might never supply. Electricity sales on the NEB’s system rose by an average of 12.1 per cent a year from 1968 to 1974. Peak demand rose by 12.4 per cent annually. To meet it, the board had to choose generating units years in advance and arrange the lines to carry their output. Its project at Port Dickson included three 120-megawatt units at the Tuanku Ja’afar station and new transmission works. An Indian supplier financed the boilers. The French government and two French banks financed the turbo-alternators. A US$20 million World Bank loan covered other equipment, civil works and services. By the time Malaysia attempted Bintulu, public managers already knew what it meant to fit several creditors and suppliers to one engineering schedule.13

The people who learned that work could teach others. In 1951 Abu Zarim Omar was one of three local shift engineers sent to Britain for training. In 1964 Raja Zainal Raja Sulaiman became the Central Electricity Board’s first Malaysian general manager. At the NEB, Abdul Kadir Shamsuddin, as chairman, and Abu Zarim, as general manager, backed full overseas scholarships for qualified students. The biographers describe Abdul Kadir giving Abu Zarim room to manage. A chairman could find the backing for scholarships. The engineer in charge knew which jobs the returning scholars had to be ready to do. That distinction would matter at PETRONAS when a national mandate arrived years before a full complement of Malaysian petroleum engineers.11,12

The oil shock of the 1970s reached the two institutions from opposite directions. Dearer oil improved the prospects for Malaysian petroleum earnings and raised the utility’s fuel costs. To restrain inflation, the government kept the NEB from passing a fuel surcharge on to commercial and industrial customers. That choice helped factories cope with the shock. It also left the board to finance investment while part of its higher costs could not be recovered from those customers. When the petroleum bill came before Parliament, Lim Kit Siang drew the connection himself. He pointed to electricity bills and delayed rural connections, and asked what petroleum policy would do for fuel users. A growing oil income and the price of keeping the lights on belonged in the same national debate.9,13,14

2  Why PETRONAS answered to the Prime Minister

On 24 July 1974 Abdul Taib Mahmud, a Sarawakian serving as federal Minister of Primary Industries, explained the choice to the Dewan Rakyat. His ministry had advanced a proposed statutory authority called Hidrokarbon Malaysia, or HIKMA. After discussions with the states, the government brought forward a company incorporated under the Companies Act 1965. Taib linked that change to a development decision. Refineries and petrochemical industries could reshape whole regions, including the east coast of the peninsula, Sarawak and Sabah. Decisions about their location and support crossed ministerial portfolios and state boundaries. For that reason, he told the House, the Prime Minister himself should take direct charge. This was the government’s public case while the bill could still be amended.15,16

Taib’s explanation also tells us something about his own leadership. A minister who had sponsored one institutional model stood before Parliament and made the case for a different one, with the decisive authority placed outside his own ministry. On 25 July he moved the amendment specifying that the National Petroleum Advisory Council would advise the Prime Minister on petroleum, industry, energy resources and their use. The Dewan Rakyat passed the amended bill that day. The Act received royal assent on 30 July. PETRONAS was incorporated on 17 August, and the Act came into force on 1 October 1974. The reporting decision preceded the birth of the company.4,15

What the Prime Minister could decide

“Under the auspices of the Prime Minister’s Department” describes where petroleum sat in government. The Petroleum Development Act was more precise about who could act. Section 2 provided for ownership of petroleum and exclusive upstream rights to vest in PETRONAS on execution of the prescribed instrument. Section 3 placed the corporation under the Prime Minister’s control and made his directions binding. Section 4 left cash payments to agreement with the federal and relevant state governments. Section 5 provided for a council appointed by the Prime Minister, including people from the relevant states, to advise him. Each provision answers a different question. PETRONAS signed contracts in its own name. When a Treasury concern about a guarantee cut across a state’s plans for a plant or port, the Prime Minister could bring those interests together and direct the company. An operator could then negotiate with a Malaysian counterparty whose decisions carried weight across ministries. The states had interests to negotiate and a statutory place in advising him.4,15

The Finance Ministry held the shares, with RM10 million in issued capital. Razaleigh wanted a company able to deal commercially with the oil majors. The biographers identify Salleh Abas and Abdul Manan Othman as working with him on the legislation and Junus Sudin on the corporate structure. Razak gave his founding chairman and chief executive standing equivalent to a Cabinet minister. A foreign company deciding whether to return a drilling rig to Malaysian waters needed to know who could stand behind a settlement. It also needed to know which Malaysian officers could agree a work programme and administer it after the political principals had left the room.16,17

I would call that combination of public authority and commercial responsibility part of PETRONAS’s initial DNA. What later generations inherited would also depend on what the first Malaysian negotiators and operators learned and passed on.

Figure 1. Institutional DNA

Caption: Conceptual representation of the relationship between founding principles, institutional culture, historical experience, governance, and adaptability. The DNA helix symbolises the enduring transmission of organisational values, knowledge, and practices across generations, shaping institutional identity, resilience, growth, and legacy.

Source: AI-assisted conceptual illustration prepared by the author.

There were two reasons to put an enterprise of this size under the head of government. One was the coordination Taib described. The other was the government’s need to retain control of the company it was creating. A. Krishnan’s legal study traced the latter concern to reporting published in August 1974. Looking back, Hassan Marican, a later PETRONAS president, saw value in a clear line to the top and recognised how much it depended on the judgment of the office-holder. Razak’s government can be credited with choosing and defending this design. The debate and drafting accounts identify a team and leave the individual authorship of section 3 open. Abdul Kadir’s documented founding contribution as Chief Secretary was to help Razak find people able to carry the mandate, and his later briefings and chairmanship put him in a position to use it.6,16,17,18

Parliament had heard the difficulty in July 1974. Lim Kit Siang wanted production-sharing contracts submitted for parliamentary ratification within three months and called for annual reports, audit and scrutiny by the Public Accounts Committee. These were proposals in debate. The Act put binding direction in the hands of the Prime Minister. Both sides of the argument still matter. A commercial counterparty needs a timely answer. A citizen whose resources are committed for twenty years needs to know what was exchanged and how performance will be judged.4,14

What Sarawak brought to the bargain

In January 1973, before PETRONAS existed, Edmund Langgu anak Saga asked the Dewan Rakyat how far Sarawak had been consulted about foreign companies seeking to explore and produce oil off its coast. Taib Mahmud replied that other firms had shown interest in acreage Sarawak Shell had relinquished. Once the federal government had settled its offshore policy, Sarawak would be consulted before a final decision on new applications. Abdul Rahman Ya’kub reminded the House that Sarawak had previously taken the lead in negotiations with Shell. For the state, a place at the negotiating table and the power to lead the talks were two different things.21

When the petroleum bill came before the House in July 1974, Abdul Rahman Ya’kub spoke both as Chief Minister of Sarawak and as the member for Payang. He backed the bill on his government’s behalf. For him the company had an immediate job. Preliminary talks on liquefied natural gas at Bintulu had already begun, and he wanted them resumed. He recounted an earlier disappointment at Selantik, where a road had been built for a prospective Japanese coal customer who subsequently bought in Australia. Sarawak knew what it cost to build for a buyer who could walk away. The insistence on securing ships, customers and finance together at Bintulu takes on a different meaning when read beside that experience.1,15

Rahman argued that Sarawak was granting rights, including offshore, and should receive cash for state administration and development. He wanted a chairman of sufficient standing and integrity to deal with chief ministers as well as foreign oil companies. In his own account to the House, he had proposed a national oil enterprise in 1965. Years later Razaleigh recalled that Rahman led the state’s negotiations with a team that included state ministers. These accounts identify different contributions. A long-standing Sarawak interest in a national company could coexist with hard bargaining about what Sarawak should receive from it.9,15,19

One official who appears in later accounts of the vesting is Bujang Mohamad Nor. He was Sarawak’s State Financial Secretary at the time and became State Secretary in 1984. Later accounts differ over who physically signed. Amalina Anuar describes him accompanying Rahman. The Federal Court’s account dates Sarawak’s vesting and cash-payment agreements to 27 March 1975 and identifies the parties institutionally. Those sources establish Bujang’s participation and leave his precise signing capacity open. Sabah’s agreement with PETRONAS for a five per cent cash payment was signed on 14 June 1976, according to the Second Finance Minister’s later statement to Parliament.19,20

The debate had also begun outside the negotiating room. On 18 July, six days before Taib’s second-reading speech, James Wong Kim Min of Miri–Subis asked what share of continental-shelf revenue would reach Sarawak. Taib replied that the percentage was still being negotiated. Wong then asked who checked the quantity Shell reported pumping and whether Customs officers were present day and night. Taib described periodic inspections by the Mines Department. Wong had put his finger on a practical condition of ownership. If the quantity is wrong, even a precisely agreed percentage delivers the wrong sum.21

After agreement, Ting Ling Kiew of Bintulu asked for both the state’s share and the volume produced. In his written answer on 2 April 1975 Razak specified five per cent of the gross value of oil and gas won and saved in Sarawak, with payments in March and September. He put 1974 crude production at about 33.1 million barrels. Bintulu’s member had obtained a basis of valuation, a production figure and a payment calendar against which the state could check its receipts.22

On 7 April, Latip bin Haji Dris of Mukah described exploration off his constituency. He urged priority for Bumiputera applicants for petrol-trading licences and proposed a levy that might help finance rural education and agriculture. Patrick Anek Uren of Bau–Lundu wanted Sarawakians represented on the PETRONAS board. The government replied that Sarawak already had representation on the advisory council. A board member participates in company decisions. An adviser can put a state’s concerns before the Prime Minister. The exchange makes clear which of those seats the minister was describing.23

In November 1975 Luhat Wan of Baram challenged the adequacy of five per cent. He pointed to the difficulty of moving about Sarawak compared with the peninsula and asked for a larger allocation. His constituents could support the federation and still judge the bargain by the cost of getting people and goods from one place to another. Through these members, people far from Kuala Lumpur put the bargain to tests of their own. The answers also gave their successors a record against which to judge what the new institution delivered.24

The Sarawak questions go to the heart of what it meant to call PETRONAS a national institution. A chairman with access to the Prime Minister could bring the same proposal to several governments and to an international operator. Its value to each party depended on different things. The operator needed terms on which it could keep investing. The producing state needed a reliable account of production and payments. A household in Mukah wanted access to fuel and work. The corporation would have to show how a bargain made in Kuala Lumpur reached all three.

PETRONAS remembers starting with fifteen employees and two telephone lines. Across the negotiating table were companies that had measured the reservoirs, bought the equipment and marketed the oil. The new corporation owned rights of great potential value. Its first officers had to discover what those rights would yield and acquire the skill to sell their share of the production. Its first test would come when it asked those companies to share their production.4

3  The bargain over the barrel

One of the first people Malaysia consulted was an Indonesian oilman. Taib Mahmud recalled asking Ibnu Sutowo, president of PERTAMINA, how Indonesia’s production-sharing contracts worked. That enquiry gave Malaysians a set of terms they could study and adapt. A different conversation took place at 10 Downing Street on 14 April 1975. According to the British record cited in The Power of Deeds, Razak explained that his government wanted a fair share of production. British officials were concerned about what would happen to assets their companies already owned. An assurance between prime ministers could ease that fear. It still left the companies and PETRONAS to agree how a dry well, a successful field and the existing installations would enter their accounts.25

The first production-sharing negotiations left both sides with something to lose. Shell and Esso had invested under an earlier system and wanted to know whether further exploration would pay. PETRONAS needed production to continue while it established a larger Malaysian claim on the proceeds. A World Bank report prepared in January 1976 recorded the practical cost of the impasse. Esso had suspended exploration and development work from May 1975 amid uncertainty over the terms. At Tembungo in Sabah, further development had stopped although oil was still being lifted at about 4,000 barrels a day. Pulai had no development date. A longer impasse risked postponing both the next round of drilling and the revenue Malaysia expected from it.10

A dispute over fuel distribution in 1975 shows how widely companies read the government’s intentions. Proposed management shares would give PETRONAS influence in licensed businesses. A United States diplomatic report of a 15 April meeting with Shell recorded Razaleigh’s explanation that the government wanted a means of control while leaving the businesses in private hands. Shell’s concern about how far that control might extend was a separate issue from the oil division in an upstream contract. For an investor considering both exploration and marketing, the two decisions bore on the same question of confidence. A chairman with the Prime Minister’s ear could explain the policy, but the next drilling commitment would still depend on its terms.10,26

Changing chairmen in the middle of a negotiation

Tengku Razaleigh, the founding chairman and chief executive, conducted the early negotiations. Razak gave a public signal at an investment seminar in October 1975, defending Malaysia’s right to shape its petroleum industry while assuring investors of a place for private capital. Before he succeeded Razaleigh, Abdul Kadir was regularly briefed at PETRONAS while still Chief Secretary to the Government. On 10 March 1976 the New Straits Times had named Abdul Kadir as the likely successor. Two days later the US Embassy in Kuala Lumpur relayed that report to Washington. The embassy added that the range of responsibilities he had carried in government made him, in its judgment, “a sound candidate”.6,9,27

On 29 September 1976 Razaleigh announced that Hussein Onn had appointed Abdul Kadir to take over as chairman on 1 October. Bernama reported the announcement that day, and the US Embassy relayed it to Washington. The clipping in Noorlina’s collection is dated 30 September. Razaleigh said he would devote his time to the Finance Ministry and that PETRONAS would maintain its negotiating policy. In his judgment, only Shell had so far shown a willingness to settle. He expected an agreement to provide revenue for further oil exploration and for projects under the Third Malaysia Plan.27,61

By 9 October Abdul Kadir had met the oil companies himself. In a report bearing that date, Cheng Song Huat recorded the new chairman’s explanation that PETRONAS was using a “formula yang berstandard”, a standard formula, in talks with Shell, Exxon and Continental Oil (Conoco). Abdul Kadir declined to disclose the percentages. The Prime Minister wanted signatures by 15 November. A common formula gave PETRONAS a basis on which it could explain a settlement to the next company and to the governments expecting revenue.27

On 15 October a US embassy officer attended a meeting between Datuk Syed Nahar, a Malaysian MP, and J. G. Walvoord, president of Exxon Production Malaysia. Syed Nahar said he was acting for Deputy Prime Minister Dr Mahathir Mohamad. He told Walvoord that both he and Mahathir had confidence in Abdul Kadir and Raja Mohar, and that Exxon could expect an offer reflecting how its circumstances differed from Shell’s. Walvoord answered Syed Nahar’s technical and financial questions. How a common formula would apply to an individual operator was still open to negotiation.62

Raja Mohar Raja Badiozaman, a former Secretary-General to the Treasury and then chairman of the National Petroleum Advisory Council, had already been named as mediator in the 29 September report. On 16 November Hussein Onn told the Dewan Rakyat what the job had involved. The sums at stake ran into billions of ringgit. Raja Mohar briefed him at each stage, sought his approval for recommendations and worked into the final half-hour before the 15 November deadline. By then PETRONAS had agreed the principal economic and fiscal terms with Sarawak Shell, Sabah Shell, Pecten Malaysia and Exxon Production Malaysia. The parties were still completing the contracts. Abdul Kadir could speak for the company across the table. Raja Mohar could take a proposal to the Prime Minister and bring back an answer while the parties were still negotiating.28,61

On 30 November Abdul Kadir signed a twenty-year agreement with Sarawak Shell Berhad and Sabah Shell Petroleum Company Ltd, effective from 1 April 1975. Backdating settled which terms governed Shell’s production during the impasse. PETRONAS and Exxon signed three agreements on 8 December.6,10

Abdul Kadir Shamsuddin signs the PETRONAS–Shell production-sharing agreement in Kuala Lumpur, 30 November 1976. Photograph courtesy of the family of Tan Sri Abdul Kadir Shamsuddin.

Tan Sri Abdul Kadir Shamsuddin (centre) and Nik Saghir Mohd Noor (left), PETRONAS’s Executive Director for Legal Affairs, sign production-sharing agreements with J. G. Walvoord (right), President of Exxon Production Malaysia Inc. PETRONAS Building, Kuala Lumpur, 8 December 1976. Photograph supplied by the author.57

A United States embassy dispatch about the Exxon signing records particular recognition for PETRONAS finance director Ismail Hashim and G. K. Rama Iyer of the planning unit in the Prime Minister’s Department. It also reported that Exxon intended to submit a work programme for joint review within six weeks. Within one ceremony the government’s interest in a settlement had become an operating company’s duty to scrutinise an investment programme.29

Abdul Kadir Shamsuddin and J. G. Walvoord look over a document at the PETRONAS–Exxon signing table, Kuala Lumpur, 8 December 1976. Photograph supplied by the author.57

What a hundred units of oil had to cover

Long before anyone signed, PETRONAS needed to know how much a contractor could give up and still have reason to drill. Shakila Yacob describes the group that did the arithmetic. Its head, Ismail Hashim, was an accountant. Economist Hasanuddin Hamid, mechanical engineer Ngau Boon Keat and petroleum engineer Mohd Idris Mansor worked alongside Khalid Ngah, Tony Lim and lawyer Yaacob Ismail. Starting with the Indonesian contract, the team calculated the return a company could expect under different divisions of the proceeds. They also examined who would receive the windfall if oil prices rose. A negotiator facing an operator who said a field would no longer pay could now ask which cost or price assumption made the difference.59

The World Bank’s contemporary account allows the earliest oil terms to be tested with simple arithmetic. Take 100 units of production. Five went to the producing state and five to the federal government. The contractor could claim eligible costs up to a ceiling of 20 units. If it used the whole allowance, 70 units remained. PETRONAS took 70 per cent of that balance, or 49 units, and the contractor 21. Those 21 units were its share before tax and other provisions. The 20 units of cost recovery repaid expenditure. The government cash payments, PETRONAS’s contractual share and the company’s eventual dividend to its shareholder belong to different stages of the calculation.10

Suppose instead that eligible costs were only ten units. The balance would be 80, of which PETRONAS would take 56 and the contractor 24. That seven-unit difference for PETRONAS explains why an accountant examining a contractor’s invoices was exercising part of Malaysia’s authority over its oil. Someone had to judge whether an expense belonged to this field and whether the work was necessary. Reject a sound investment and the partners might leave recoverable oil underground. Accept a questionable cost and the public share could be diminished within the terms of an apparently favourable contract. These examples illustrate the early formula, before taxes, bonuses and other adjustments. Later contracts had their own terms.10

One small clause deserves attention. The same 1977 account recorded a contribution to a PETRONAS research fund of half of one per cent of the proceeds from the contractor’s sales of its cost oil and profit oil. This was a modest item beside the division of output. Its importance lay in what it allowed Malaysia to buy over time. A negotiator who could commission an independent technical judgment would be in a different position at the next round. The agreement therefore touched the distribution of knowledge as well as the distribution of income.10

The arrangement preserved access to experienced operators and gave PETRONAS a reason to develop people capable of challenging them. A contract could oblige a company to supply figures. Only staff who understood a reservoir, a drilling programme and a balance sheet could decide whether the figures warranted another question. In that respect each production-sharing agreement was a continuing assignment for the Malaysian side. The signature at the PETRONAS Building marked its first day.

By early 1978 the British government itself was asking for a continuing relationship with PETRONAS. Sir Jack Rampton of the UK Department of Energy met Abdul Kadir in Kuala Lumpur that February. In a letter of 8 March, cited by the biographers, he proposed informal meetings about once a year in London or Kuala Lumpur. Britain now had a young national oil company of its own. Three years earlier Britain had wanted assurances about its investors. Now a British official was proposing a regular exchange between two countries learning to run national oil companies.25,30

4  How a national company learned its trade

Razak turned to Abdul Kadir to identify officers for PETRONAS. As Chief Secretary he knew people from defence, the central bank and the wider civil service. The company also recruited from private industry, including ICI and Mobil. One of its earliest management decisions was to put people with different kinds of experience on the same problem. Junus Sudin helped Razaleigh put the company’s corporate structure in place. Ismail Hashim, head of finance, helped prepare the production-sharing arrangements that would allow PETRONAS to raise funds against the rights it had received. A lender needed to know how much oil PETRONAS could claim, when it could sell it and which costs came first.18,31

Nik Saghir Nik Mohd Noor came to that problem from the other side of the document. In government he had worked on tax matters and helped negotiate loan agreements with the World Bank, the Asian Development Bank and export-credit institutions. At PETRONAS he handled the legal work on the first contracts with Esso and Shell. Another lawyer, Wan Ismail Wan Mohd Salleh, took responsibility for personnel. Even in a small office a legal qualification could lead to very different jobs. Someone had to write terms a company could enforce years later. Someone else had to recruit the people who could tell PETRONAS whether the other party had kept them.31

Rastam Hadi, a former mathematics teacher who had worked under Abdul Kadir in defence and served as a deputy governor of Bank Negara, was PETRONAS’s managing director by August 1978. He in turn recruited Anwarrudin Ahamad Osman from defence. In the early office, the young officers copied and circulated news about the oil industry. A dispatch from abroad could change the assumptions an officer took into a meeting with a contractor. Passing it to the colleague preparing the budget gave both a chance to work from the same information.18,31

Rastam and his former teaching colleague Yahaya Ibrahim approached Ford Henderson of Diametrics about training their recruits. The banker Rais Saniman enlisted a Norwegian banking contact, Nils Gulness, to arrange a visit. Rastam and Rais went out to the Ekofisk platform in the North Sea. Malaysians returning from Singapore refineries brought operating experience directly into the company, and geologist Tony Lim joined to help with exploration. PETRONAS began sponsoring students in 1975. A teenager sent to study engineering that year would still be learning when Abdul Kadir signed the Shell agreement. Visiting an operating platform, recruiting someone who had run machinery and paying for a degree answered different needs on different timetables.18

Who would sell Malaysia’s share?

Production sharing created a job Malaysia had scarcely needed under the concessions. Once PETRONAS took title to its share of crude, someone had to find a buyer and judge the price on offer. Muri Muhammad came from the Fisheries Department by way of ICI, where he had worked in marketing and personnel, and Bank Pertanian, where he helped establish a trading organisation. He joined PETRONAS in 1975. In 1976 he established its International Marketing Department to trade crude oil and petroleum products. He would later manage MLNG from 1988 to 1996. Between those two appointments lay the difference between finding a market for Malaysia’s share and taking responsibility for an enterprise that had to supply one.32

Muri’s name appears in the copy line of a telex in Noorlina’s collection. On 9 November 1978 David Tobey of Philipp Brothers sent a telex from New York to Rastam Hadi and copied it to Muri Muhammad by name. Tobey recalled meetings with Abdul Kadir over the years. The copy line caught a working relationship that the organisation chart alone could scarcely convey.32

A visit could show an officer how a platform worked. It could scarcely reproduce the responsibility of authorising a well. In 1978 PETRONAS incorporated its exploration and production arm, PETRONAS Carigali. That August, after failing to agree production-sharing terms with PETRONAS, Conoco agreed to sell Carigali its concession interests off the east coast of the peninsula. While the Shell and Exxon settlements left the operators in place, the Conoco transaction gave the Malaysian company acreage on which to commit its own exploration funds. In 1981 Carigali made its first oil discovery at Dulang. Staff accustomed to reviewing an operator’s case for drilling could now be required to make the case themselves, spend a budget and answer for the result. Even an unsuccessful well could produce knowledge of a formation and of what it cost to test an idea. In an industry that rewards a discovery, retaining the people and records of unsuccessful work is a quieter source of competence.5

The same distinction matters for the Malaysians a modern employer sends on secondment. An engineer who observes a partner’s commissioning team gains experience. An engineer who is later put in charge of accepting equipment, stopping unsafe work or training the next shift gains authority that stays with the employer. Numbers of trainees are easy to publish. The more revealing record would follow them into the jobs where they approve a design or sign for performance. Bintulu was about to offer such jobs on a scale the early office could scarcely have imagined.

5  Bintulu before the first cargo

An oilfield can sometimes find a buyer as soon as there is a way to load a tanker. Gas in Central Luconia presented a harder problem. It had to be gathered offshore, brought ashore and cooled to about minus 162 degrees Celsius so it could travel as a liquid. At Bintulu that meant a plant, storage and a berth. At sea it required specialised ships. At the other end a utility needed receiving facilities and enough customers to absorb the supply. Consider the position of the first party asked to invest. A port without regular cargo would earn little. A plant without ships would fill its storage. A buyer could scarcely plan a city’s winter gas supply on the assurance that the other arrangements would follow.33,34,35

The Malaysia LNG complex at Bintulu, Sarawak, in an AI-assisted sketch. Storage tanks let the plant continue liquefying gas between calls by LNG carriers at the loading jetty.

In that light Hussein Onn’s parliamentary answer takes on a second significance. The shipowner, usually known as MISC, had a Malaysian interest to defend too. A freight rate generous enough to pay comfortably for expensive vessels could make the delivered cargo less competitive. A rate set too low could leave a Malaysian carrier with years of losses. National ownership on both sides of the negotiation offered no automatic answer to a disagreement between two sets of accounts. Somebody had to decide how much risk the venture could carry and where it should sit.1

The joint-venture agreement followed on 31 March 1978. Malaysia LNG Sdn Bhd, or MLNG, was incorporated on 14 June. PETRONAS held 65 per cent of the original company. Shell Gas B.V. and Mitsubishi Corporation each held 17.5 per cent. PETRONAS could represent the Malaysian majority in a company whose partners also had money at risk. Shell brought experience of gas and offshore operations. Mitsubishi connected the venture with Japanese business and prospective customers. The eventual buyers, Tokyo Gas and Tokyo Electric Power, would have to justify their purchases to people who depended on them for fuel or electricity. A shareholding and a purchase commitment settled different questions.33,34

Who was doing the work in August 1978?

A. Kadir Jasin’s front-page report in the Business Times on 2 August is a rare view of the work before anyone could know its outcome. He identified Abdul Kadir as chairman and chief executive of MLNG, with M. B. Hashim as managing director. Rastam Hadi was managing director of the parent company, PETRONAS. The distinction becomes important when reading the correspondence. A request addressed to Hashim went to the project company charged with developing Bintulu. A request addressed to Rastam went to the national corporation with responsibilities across the industry.33,36

In the same report, appraisal drilling in Central Luconia had been completed. Work on the gas-gathering scheme was under way, officers were preparing tender documents for the plant, and discussions with prospective Japanese customers were described as preliminary. A drilling result could give an engineer confidence about the amount of gas offshore. It could also change the quantity a marketing team dared promise for twenty years, and the size of the plant for which procurement officers should invite tenders. Work had to advance on all three fronts while there was still room for each to alter the others.33

For the Malaysians preparing the tender, a technical specification had consequences well beyond the plant fence. A bidder could offer a lower purchase price for equipment that consumed more energy or took longer to bring into service. A later start would postpone the receipts from which debt had to be serviced and could leave a ship waiting. The value of a construction-service agreement lay partly in assigning someone to resolve such mismatches. For a majority shareholder, the practical task was to have enough people on its own side who understood the specifications, the cost of delay and the customer’s delivery date to make a choice between competing bids.

A banker’s visit and the question of a guarantee

On 8 November 1978, John Moore, chairman of the Export-Import Bank of the United States, arrived in Kuala Lumpur. He expected to meet Abdul Kadir and senior PETRONAS officers the following day about a project then estimated by the US Embassy at US$1.2 billion. Abdul Kadir died that afternoon. PETRONAS cancelled the meeting. The embassy’s account of 13 November records what the Americans learned from Bank Negara Malaysia and the Economic Planning Unit instead. It gives an unusually candid picture of the choices still open less than five months after MLNG was incorporated.37

Chase Manhattan Bank had been selected as financial adviser. Bank Negara’s representatives spoke of seeking a Japanese loan untied to purchases from a particular country. They also wanted more sources of finance and welcomed American interest. Tan Sri Thong Yaw Hong, director-general of the Economic Planning Unit, told the visitors he did not know whether the Malaysian government would guarantee the project. Equipment bids were due in two rounds, the first at the end of November and the remainder early in January. Thong wanted bidders to submit financing proposals with their equipment offers. He also discussed the possibility of combining Japanese export credit with cheaper government lending.37

The central bank and the planners could share a national objective and still approach it differently. Untied credit would leave the procurement team freer to choose among suppliers. A supplier-backed offer might lower the cost of borrowing but limit what could be bought with it. A federal guarantee might make a loan cheaper by making taxpayers answer for a failure. Without it a lender would have stronger reasons to examine the gas supply, the quality of the contractor and the purchaser’s undertaking. The cable catches Malaysian officials weighing these trade-offs. Its dollar figure was an estimate, and the Americans were prospective participants. The financing of a plant cannot be reconstructed by simply listing the banks that made the journey.37

Bankers in three financial centres wrote to PETRONAS in the days after Abdul Kadir’s death. On 9 November John T. Olds of Morgan Guaranty Trust in Singapore wrote to Rastam, and Zainuddin Haji Din of the Malaysian merchant bank Pertanian Baring Sanwa wrote to him in Malay. Mamoru Sakai of the Long-Term Credit Bank of Japan addressed PETRONAS’s board on 10 November. Each offered condolences. These documents show how many financial institutions knew where to reach PETRONAS. The embassy’s account identifies the specific advisory appointment held by Chase Manhattan. For a country seeking competitive finance, several banking relationships mattered well before any one bank signed a loan.37,38

6  What survived the chairman

Abdul Kadir died on 8 November 1978 with decisions about the plant, loans and gas sales still ahead. In an English-language notice preserved by my sister Noorlina, the directors and staff of PETRONAS, Malaysia LNG and PETRONAS Carigali mourned the man they called “our beloved chairman”. A Malay-language notice names the same three companies. Their names together on one page capture the extent of the succession problem. The parent company was negotiating over national resources, one subsidiary was preparing to sell gas, and another was taking on exploration. Each would need people who could carry on the work.33,37,39

Three messages from Mitsubishi to Rastam Hadi survive together on one sheet. They are dated 9 November and stamped received at PETRONAS on the 11th. Vice-chairman Keizaburo Yamada sent his condolences to the family. President Bunichiro Tanabe wrote that the partners had “just started” to realise their joint LNG project. Yutaka Yamamoto, general manager of the Gas Department, credited Abdul Kadir with a “leading and indispensable role” in promoting it. Tanabe’s words convey how early the venture still felt in Tokyo. Yamamoto gives the more personal judgment of the executive in charge of gas. A separate message from managing director Hiyoshi Hama recalled meeting Abdul Kadir in Japan only two months earlier.36

The first two of three Mitsubishi messages to Rastam Hadi on 9 November 1978. Bunichiro Tanabe writes as president and Yutaka Yamamoto as head of the Gas Department. Noorlina’s Scrapbook Collection, Telegrams and Telexes, vol. 2, leaf 2. Detail, courtesy of the family.

Letters to the family and to the company

Malaysia’s ambassador in Tokyo put two notes on one transmission. On 10 November Datuk Lim Taik Choon first addressed Rastam on behalf of himself and his embassy staff. Then he wrote to Puan Sri Zainab, Abdul Kadir’s widow, through PETRONAS. In the second message he spoke of losing a friend. The two messages kept a working relationship and a friendship on the same sheet.40

The Japanese utilities made their own choice of address. Takeo Murakami of Tokyo Gas, and Gaishi Hiraiwa and Masami Tajiri of Tokyo Electric Power, wrote to Rastam at PETRONAS. Yoshio Suzuki, president of the engineering company JGC, addressed M. B. Hashim, managing director of MLNG, about the loss of the chairman of his board. Frank H. Shipman Jr of Pullman Kellogg wrote from Houston to Rastam at the parent company. Those different addresses help explain how a project could survive its most visible sponsor. People abroad already knew officers in both companies. The tender decisions and sales commitments can then be followed in the later parliamentary and commercial records.34,36,41

The letters contain two different responses from the oil companies with which PETRONAS had bargained hardest. Peter Baxendell of Shell wrote to Hussein Onn on 8 November. He remembered Abdul Kadir’s “firm yet kindly manner” and described him as an able businessman. Charles A. Rose, managing director of Esso Malaysia, addressed Rastam and the PETRONAS staff the following day. The PETRONAS stamp shows that the letter arrived that same day. Baxendell put his personal assessment on record with the Prime Minister. Rose’s letter of sympathy went directly to the people on whom the working relationship would now depend.42

Other witnesses had seen him at closer quarters. Abdul Aziz Ahmad, writing in Malay from Innsbruck to Puan Sri Zainab, recalled working under him in both government and PETRONAS. What had earned his respect was his chief’s humility. N. J. Cochrane, senior partner of consulting engineers Sir William Halcrow & Partners, remembered meetings in Kuala Lumpur over three years. In his 14 November letter he credited Abdul Kadir with steering PETRONAS through its vulnerable early growth. The engineer could see a stronger institution. The man who had worked under its chairman could say something about how it felt to serve there.42

From a promise to a delivery schedule

After November 1978, MLNG’s board and officers had to make choices their chairman had helped prepare. They had to select contractors, keep a project schedule across land and sea, and obtain a commitment from utilities with customers of their own. In November 1979 MLNG and the two Tokyo utilities signed a confirmation of intent. In March 1980, Parliament was told it envisaged six million metric tonnes a year for twenty years. Members were also told that production had yet to begin. The distinction mattered. A specified volume and term gave engineers and lenders figures to work with. They still depended on a plant and ships capable of meeting the promise.34

The Sarawak legislature was told in December 1979 of the selection of JGC and Pullman Kellogg for the plant. JGC’s own project record describes its engineering, procurement, construction and commissioning work at Bintulu. Just over a year separates the two companies’ messages of sympathy from the legislature’s account of their selection. In reconstructing a negotiation, that year matters. The project team was still in a position to weigh bids when both companies knew the Malaysians well enough to write.35,36,41

At Bintulu, engineers had to make a stretch of coast fit to receive those ships. Japan’s international cooperation agency records a May 1980 loan agreement for ¥7.8 billion from the Overseas Economic Cooperation Fund for port works. The scope included dredging and breakwaters, with provision for the LNG pier. It records completion of these works in December 1982. The loan financed a defined part of the port. It can be traced separately from the financing options for the liquefaction plant discussed in Kuala Lumpur two years earlier. By then a financing choice had become depth beneath a ship’s keel and shelter at the berth.35,37

The government’s Fifth Malaysia Plan records the E11 gas field coming on stream in 1982. PETRONAS dates the first LNG cargo for Japan, carried by Tenaga Satu, to 29 January 1983. The Japanese buyers later described their original twenty-year commercial supply period as April 1983 to March 2003. These dates record successive achievements. Bringing the field into production, loading a first cargo and settling into a regular delivery programme each tested a different part of the system. Abdul Kadir had been dead for more than four years when the cargo went to Japan. Credit for those intervening years belongs to the people who brought the field, plant, port and fleet into service.2,34

The buyers’ account discloses something else about the freight discussion with which this story began. Under the original contract all LNG was delivered ex-ship. The seller arranged carriage to the receiving port. In the 2003 renewal the buyers could take part of the supply free on board, arranging that shipping themselves, and had more room to vary volumes. Buyers confident enough to organise freight could now judge its cost differently. The commercial relationship lasted long enough for the parties to change who did the work. That is one return on a reputation for delivery which never appears in the price of a single cargo.34

The office Abdul Kadir had held also changed. He was succeeded at PETRONAS by Tan Sri Abdullah Mohd Salleh, who had likewise served as Chief Secretary to the Government. Abdullah led the company when the first cargo sailed. In August 1984, at PETRONAS’s tenth anniversary, Prime Minister Mahathir Mohamad greeted Raja Mohar as chairman and Abdullah as president. The man running the company now answered to a board chaired by someone else. That change is one reason to speak of PETRONAS’s initial DNA. Malaysia could keep its undertaking to its Japanese customers even as it changed who ran the enterprise and who oversaw it.60

7  What Sarawak gained, and what Malaysia took abroad

Two telegrams in Noorlina’s first volume carry the voices of the producing states. Abdul Rahman Ya’kub wrote from Kuching to Puan Sri Zainab. Harris Salleh wrote from Sabah, calling Abdul Kadir a “sahabat karib saya”, a close friend of his. Both telegrams bear the Kuala Lumpur telegraph office’s 9 November 1978 stamp. Read beside the biography’s account of difficult federal–state negotiations, these personal messages make it easier to understand how their participants could maintain relationships across deep differences. A later Sarawak member of Parliament still had every reason to ask the federal government to account for the bargain.20

There was an institutional test of that relationship as well. Reporting to the Dewan Negara in 2024, the Minister of Economy dated the National Petroleum Advisory Council’s first meeting to 9 April 1975 under Raja Mohar. He said it had been inactive since 1995 and that Sabah and Sarawak were represented on the National Energy Council, which met in April 2024. Patrick Anek Uren’s distinction between advice and a board seat thus has a further dimension. Even a place written into law tells a producing state little about its practical voice unless the body meets, sees the relevant figures and can put its advice to the decision-maker.23,43

When Ling Siew Ming raised his question in March 1983, the government reported that 35 of MLNG’s 65 senior officers came from Sarawak, as did most of its 360 non-executive employees. It also pointed to the opportunity for local employees to learn from foreign specialists. The distinction between those two answers is worth keeping. The first gave Sarawakians a figure against which to judge recruitment. The second was a promise whose value would be known only when a local officer could run a shift, manage a maintenance shutdown or supervise the foreign specialist’s successor.3

At the E11 gas hub that had fed the first Bintulu plant, responsibility took much longer to pass. Sarawak Shell operated the hub for 38 years. On 1 January 2021 PETRONAS Carigali took over as operator. For the Malaysian company, the change meant having to maintain the supply of gas from facilities that other people had designed and run. It is possible to put a date on that transfer of responsibility. A headcount in 1983 could only suggest how far the country might go.44

The written reply put an equally important qualification on the state’s cash entitlement. Sarawak was allocated five per cent of the value of the natural gas sold by PETRONAS and Sarawak Shell to MLNG. A reader who applied five per cent to the price of a cargo discharged in Japan would be using a different transaction. The latter included the value added, and costs incurred, by liquefaction and transport. Two people could agree on five per cent and still disagree on the amount if they were pricing the gas at opposite ends of the voyage. That was as much a matter of public accountability as the percentage itself.3

The reply also identified a local asset of a different kind. A deepwater port at Tanjung Kidurong offered producers in the surrounding districts another route for processing and exporting goods. Whether a particular producer could use it still depended on roads, services and customers. A similar distinction can be made about industrial employment. A contract won by a local firm creates lasting value if the firm can use the skill or equipment on its next job. The number of cargoes passing through Bintulu and the development experienced by a Sarawak household are both measures of economic activity. They answer different questions.3,35

Gas for Malaysian factories, gas for overseas customers

Tapis, discovered off Terengganu in 1969, began producing oil in March 1978 under Esso’s production-sharing agreement with PETRONAS. The wells needed a base ashore. Answering Mustafa Ali in Parliament that month, Hussein Onn said that the state government, with help from PETRONAS and the federal government, was preparing one at Tanjung Berhala in Kemaman. Abdul Kadir inspected possible development sites along the coast that July. In March 1983 PETRONAS’s first refinery began operating at Kertih, producing fuels on the Terengganu coast for sale at home and abroad.58

Tan Sri Abdul Kadir Shamsuddin, Chairman and Chief Executive of PETRONAS, inspects land under consideration for development on the Terengganu coast, 20 July 1978. Whether this parcel became part of the Kertih complex remains unconfirmed. Photograph supplied by the author.

The first phase of the Peninsular Gas Utilisation project, completed in 1984, delivered gas to customers in Terengganu. The Fifth Malaysia Plan identified the refinery at Kertih, iron and billet production at Chukai and the power station at Paka. Subsequent pipelines linked Kertih to customers on the west coast and in the south. A factory with access to fuel could produce saleable goods. A utility could generate electricity. Both could create national income even though the gas never appeared on an export manifest. They also needed a price and a supply commitment on which an industrial investment could reasonably depend.45

Before PETRONAS became an overseas investor

When Taib Mahmud asked Ibnu Sutowo about production sharing, Malaysia was still deciding what terms to seek from the oil companies. By the time Abdul Kadir visited Piet Haryono in Jakarta in January 1977, PETRONAS had signed agreements with Shell and Exxon and was responsible for putting them into effect.6,25

Tan Sri Abdul Kadir Shamsuddin, Chairman and Chief Executive of PETRONAS, in conversation with Major General (Ret.) Piet Haryono during Abdul Kadir’s official visit to PERTAMINA in Jakarta, 7–9 January 1977. Haryono, seated second from the right, served as President Director from 1976 to 1981. Photograph supplied by the author.56

On 10 November 1978 Geronimo Velasco of the Philippine National Oil Company singled out Abdul Kadir’s contributions to the ASEAN Council on Petroleum, known as ASCOPE. The council’s founding declaration had been signed in Jakarta three years earlier. Of all the work with which he might have associated the Malaysian chairman, Velasco chose to remember what he had done in a regional body where national petroleum institutions dealt directly with one another.46

Geronimo Velasco of the Philippine National Oil Company to PETRONAS, 10 November 1978. He singled out Abdul Kadir’s contributions to ASCOPE. Noorlina’s Scrapbook Collection, Telegrams and Telexes, vol. 2, leaf 37. Detail, courtesy of the family.

That cooperation also reached below the level of chairmen. Anwarrudin, the younger officer recruited by Rastam, went on to serve for several years on ASCOPE’s technical committee. In 1989–91 he represented Malaysia in discussions between OPEC and non-OPEC countries. He also held responsibility for international marketing at PETRONAS. The career of one recruit links work that can look quite separate in official accounts. Learning to sell crude gave Malaysia people who understood what other producers faced. Committee work gave those people regular contact before either side was ready to offer a commercial deal.46

By 1991 a Malaysian team could also offer its expertise to another resource owner. On 9 September PETRONAS signed a production-sharing contract with Petrovietnam for two blocks offshore Vung Tau. PETRONAS now sat on the investor’s side of the kind of agreement Tengku Razaleigh, Raja Mohar and Abdul Kadir had negotiated at home. It would be judged on the exploration capital, technical work and prospects for production it could offer the host country. Learning how a contractor assessed risk in Malaysia had acquired a second use abroad. Overseas failure was also a possibility. A national company investing outside its borders puts Malaysian capital, as well as Malaysian expertise, to the test.5

In July 2025 PETRONAS reported the departure of its first cargo from LNG Canada at Kitimat, where it holds a 25 per cent stake through a wholly owned entity. At Bintulu it had led a Malaysian-majority venture. In Canada it could participate as a minority partner and still add a source of supply to its international business. That broader portfolio can give a seller options if one source is interrupted. The value to Malaysia depends on what remains after foreign taxes, operating costs and reinvestment, and on what expertise comes home. A cargo leaving British Columbia counts as a PETRONAS commercial achievement. Its value reaches Malaysians through different routes from the cash payment on gas produced in Sarawak.47

8  Following the money into national development

In a Dewan Rakyat debate on 7 November 1974, the member for Batu Pahat, Abdul Jalal Haji Abdul Bakar, expressed the hope that his constituents would have enough kerosene. In the same debate Lee Lam Thye raised refining, marketing and distribution, as well as training Malaysians in petroleum economics and technology. A household needing fuel and a country wanting to train its own engineers were two constituencies of the new company from the beginning. A supply of kerosene and a skilled job were benefits people could recognise long before anybody calculated a dividend.48

The sale price of a cargo is an inviting but misleading starting point for measuring public wealth. The buyer pays a seller. The seller pays for feed gas, plant operations, transport where applicable and the capital committed years earlier. Investors receive their shares under the relevant agreements. Governments collect taxes and resource payments. PETRONAS may retain earnings for investment and may pay a dividend to the federal government as shareholder. Counting the sales receipt, the company’s earnings and the dividend as three additions to Malaysia’s wealth would count some of the same money several times. Following the claims in order makes it possible to ask the more interesting question of who can use each ringgit, and for what.

What the public accounts can tell us

Malaysia already had experience with the part of development that begins after money is voted. Under Razak’s Rural Economic Development Plan, introduced in 1961 and known as the RED Book, district operations rooms gathered information about local needs and progress. The biographers place Abdul Kadir among the officials who helped Razak establish the national operations room. Years later, a federal appropriation for rural roads or electricity still had to reach an actual settlement. The officers who knew where the road stopped or which villages lacked power supplied a kind of knowledge that the revenue accounts could never contain.49

The Fourth Malaysia Plan’s review of the 1970s identified petroleum cash payments as a new source of government income and recorded the introduction of a petroleum export tax in 1980. During the Third Malaysia Plan, from 1976 to 1980, actual public development expenditure from all sources was RM24.94 billion. Across the decade from 1971 to 1980 the government also recorded RM2.46 billion spent on roads and bridges and RM243 million on rural electrification. Expanding petroleum receipts helped support a public programme that drew on other taxes, savings and borrowing as well. Those accounts establish the priorities of the period. They give no basis for assigning a particular bridge or village power line to receipts from an individual oilfield.50

PETRONAS’s figures for 2025 show how the channels have developed. It reported a RM32.0 billion dividend to the federal government, RM19.6 billion in taxes and RM10.8 billion in petroleum cash payments. It listed state sales tax, export duty and a contribution to the National Trust Fund separately. It also spent RM41.6 billion on capital investment across the group. A dividend enters the federal accounts. A state’s cash receipt supports its own finances. A company investment can maintain a field or earn income in a later year. In reading these figures, a Sarawak budget officer, a federal finance minister and a PETRONAS engineer each have a different sum to account for.51

The National Trust Fund, or Kumpulan Wang Amanah Negara, provides a rare case where one can follow the money further. Established in 1988, it had received RM11 billion in cumulative contributions from PETRONAS by the end of 2022. PETRONAS was its sole contributor over that period, and the fund also earned investment income. Its 2022 annual report recorded RM4.985 billion used for COVID-19 vaccines and related expenditure by that December. Roughly RM3.804 billion went to vaccine acquisition and RM1.181 billion to related costs, including the work of running vaccination centres. A resource harvested in one generation had left Malaysia with a financial asset it could use during a national health emergency.52

Here the final step was institutional too. Public health officers had to verify deliveries, clinics had to reach people and expenditure had to be accounted for. A fund capable of buying vaccines is one national asset. A health service capable of delivering them is another. The fund’s annual report also raised the question of replenishment after the drawdown. Both the immediate public benefit and the smaller balance inherited by future Malaysians belong in an honest account of what the expenditure achieved.52

9  Three decisions the founding generation would recognise

What if a higher oil price brings less money to the budget?

The Ministry of Finance’s Fiscal Outlook for 2027 illustrates how easily a shortcut can fail. In its revised 2026 estimate, the ministry assumed an average world crude price of US$85 a barrel, yet expected petroleum-related revenue to fall to 15.1 per cent of federal revenue, principally because the expected PETRONAS dividend was RM27 billion, down from RM32 billion paid in 2025. For 2027 it projected a RM32 billion dividend and RM61.2 billion in total petroleum-related receipts, or 16.1 per cent of federal revenue. The two forward years are budget estimates. The size of the reservoir, today’s crude price and the amount a finance minister can spend next year are three separate things.51,53

Suppose a government commits a permanent service to the higher dividend and the following year’s transfer is smaller. Teachers, nurses and maintenance teams still have to be paid. Asking the company for more can preserve the service this year while squeezing investment that might sustain future payments. Borrowing moves part of the cost to later taxpayers. A reserve can buy time if earlier governments have built one. Malaysia’s experience with the trust fund makes the trade-off tangible. The public can judge a dividend decision more fairly when it can see the service to be financed, the investment the company would forgo and how the Treasury would cope with a lower payment.

Who gets the next unit of Sarawak gas?

For a Sarawak manufacturer, a dependable supply can determine whether a new plant will be built. For a Japanese customer, a contracted Malaysian cargo may be part of a winter supply plan. PETRONAS describes the expanded Bintulu complex as having nine production trains and capacity of 29.3 million tonnes a year. That is what the facilities are designed to handle. Annual output still depends on available feed gas, maintenance and demand. A nameplate figure cannot answer a prospective industrial customer’s question about gas available at its gate.2

The federal–Sarawak joint declaration of May 2025 recognised a role for Petroleum Sarawak Berhad (PETROS) as the state gas aggregator and affirmed that PETRONAS’s existing LNG commitments would be honoured. PETRONAS sought judicial clarification of the regulatory framework in January 2026. In March, the Federal Court gave it leave to proceed. By September, Sarawak had also filed its own petition, and the parties were discussing how the two cases should be heard. On 5 November 2026 Premier Abang Johari Tun Openg described an in-principle quantity of 1.2 billion standard cubic feet a day for Sarawak and raised a practical question about which fields and infrastructure would deliver it. He expressed the hope of reaching a settlement by year-end. His account is evidence of the work still under discussion at that date.54

Consider a year in which an offshore field delivers less than forecast just as a new Sarawak plant is ready to start. A promise in cubic feet needs a source field, pipeline capacity, a delivery point and an agreed course of action if gas falls short. Making up an export cargo elsewhere may be possible at a price. Delaying a factory may cost jobs and undermine future investment. Bringing a new field forward requires capital and time. Showing the cost of each course and naming who would bear it would give both Parliament and the state legislature a more informative measure of the bargain than either a percentage or a headline volume alone. Oo Gin Sun and Ling Siew Ming were already asking its two essential questions.

What can travel from LNG to electricity?

On 26 October 2026 Singapore’s Energy Market Authority granted Sembcorp Utilities conditional approval to import 1.3 gigawatts of electricity under a proposed regional initiative. PETRONAS and Tenaga Nasional Berhad are the Malaysian participants, alongside Vietnamese and Singaporean partners. The proposed sources include Vietnamese offshore wind and Malaysian solar power. The regulator said the parties still needed approvals, power-purchase agreements and financing, and that the importer was working towards starting by 2035. That is a stage of development the readers of A. Kadir Jasin’s August 1978 report would recognise.55

For Malaysians who know the two earlier institutions, there is a practical question to ask before equipment is ordered. Which engineers will have authority to accept the interconnection, and which will operate it when power is due across the border? At the NEB a scholarship could put an engineer on that path. At PETRONAS, learning to question a partner’s cost estimates could put an officer in charge of the next negotiation. A regional electricity venture offers the same opportunity only if its agreements give local operators access to the design work, commissioning and decisions about outages.10,11,55

There is a limit to what Bintulu can teach the electricity partners. An LNG cargo can wait in a tank or, where contracts allow, be redirected to another port. A cable connects particular grids, and electricity supply and demand have to be balanced as power flows. A buyer will want to know who supplies the shortfall when wind output drops. A grid operator will want to know who pays if a transmission link is delayed. A lender will ask which obligations still earn revenue in those circumstances. The historic competence worth taking into this negotiation is the ability to put the buyer, engineer, financier and regulator to work on the same set of assumptions early enough for any one of them to change the design.

When people speak of PETRONAS’s DNA, I think of a minister explaining in public why his own ministry should yield the lead. I think also of a Sarawak member asking who checked Shell’s meters, of a mediator getting a prime minister’s decision before the clock ran out, and of the Malaysians who still had to make the first ship sail. The founding settlement gave them authority to act together. What made that authority worth having was their ability to answer for a barrel, a contract or a cargo. The next generation will face the same test when it promises gas to a Sarawak factory, income to the Treasury or electricity to a customer across the sea.2,15,21,28

About the author

Dr Shamsul Bahar Abdul Kadir is a Malaysian medical doctor and public health and community medicine specialist who served in Malaysia’s Ministry of Health before moving into business, consultancy, capacity building and community development. He is the second son of the late Tan Sri Abdul Kadir Shamsuddin and, in collaboration with the University of Malaya, initiated the research project that resulted in the 2020 biography The Power of Deeds: The Untold Story of Abdul Kadir Shamsuddin. He continues to research and preserve documentary material relating to his father’s public service and PETRONAS years.

Sources and notes

The published book. All references to The Power of Deeds use the page numbers printed in the 2020 MPH edition, including the Roman numerals in the front matter. The notes distinguish participants’ recollections from contemporary documents quoted by the biographers.

Noorlina Abdul Kadir’s Scrapbook Collection. The family has submitted the collection to Arkib Negara Malaysia, where accessioning and archiving are in progress. The references identify the numbered leaves in the family’s four supplied volumes of scans. These comprise Letters, Newspaper Cuttings, and the two volumes of Telegrams and Telexes. Dates of dispatch and receipt are given separately where the documents show both. English renderings of remarks in Malay are the article’s translations.

The article and public records. The article builds on the seven project manuscripts, especially Chapter 5 on production sharing and Chapter 6 on Malaysia LNG, Research Memorandum No. 1, and Dr Shamsul Bahar Abdul Kadir’s Malaysia LNG: Before the First Cargo. The Shell signing photograph also appears in the Malaysia LNG article. The author supplied the photographs of the Exxon signing, the Jakarta visit and the Terengganu inspection. The colour photographs have been adjusted for fading. The telex illustrations come from the family scans. Three further project papers framed the inquiry into the founding decision. They were Why PETRONAS under PMD, PETRONAS versus the Oil Majors, and PETRONAS, PMD, Tun Razak & TSAKS. The notes identify the parliamentary record, published statute, family sources and financial records supporting the article.

1      A shipping rate in Parliament. Dewan Rakyat, Penyata Rasmi Parlimen, 21 March 1978, question 4, “Projek Gas Asli Cecair (LNG)”. The explanation given to Oo Gin Sun distinguishes the initialled agreements from the shipping negotiations.  Parliamentary record, digital reproduction

2      The field, the first cargo and the expanded complex. Fifth Malaysia Plan, chap. XV, “Mining”. PETRONAS, “Building Partnerships”, FLOW, issue 2 (2017), on Tenaga Satu and the 29 January milestone. PETRONAS’s LNG business overview gives the modern complex’s nine trains and 29.3 million tonnes of annual capacity.  Field production  ·  First cargo  ·  Bintulu capacity

3      What the people of Sarawak gained. Dewan Rakyat, 21 March 1983, question 59, cols. 6837–6838. The written reply to Ling Siew Ming specifies the valuation point for the state’s payment, MLNG employment figures, opportunities for skills transfer, and the port at Tanjung Kidurong.  Parliamentary record

4      A Malaysian-owned company. Malaysia, Petroleum Development Act 1974 (Act 144), ss. 2–5 and the Schedule. Section 3(2)–(3) establishes the Prime Minister’s authority to issue directions. PETRONAS, “Our Brand Story”, gives the initial staff and telephone figures. Its 2014 Sustainability Report identifies the Malaysian government as sole shareholder.  Act 144, original Gazette  ·  Company beginnings  ·  Company profile

5      Carigali and the first overseas upstream venture. PETRONAS Integrated Report 2024, fiftieth-anniversary chronology. Entries for 1978, 1981 and 1991 cover Carigali, Dulang and Vietnam. The signing photograph identifies the two offshore blocks and date. Shakila Yacob, p. 133, dates Conoco’s agreement to sell to August 1978. Silvana Tordo with Brandon S. Tracy and Noora Arfaa, National Oil Companies and Value Creation (World Bank, 2011), p. 78, records Carigali’s acquisition of the east coast interests.  Company chronology  ·  World Bank account

6      The handover, mediation and signatures. The Power of Deeds, p. 213 on Abdul Kadir’s briefings as Chief Secretary, and p. 214 on Raja Mohar’s mediation, the Shell agreement signed 30 November 1976 with effect from 1 April 1975, and the three Exxon agreements signed 8 December. The separate role of Razaleigh in the earlier negotiations is discussed on both pages.

7      A son’s account of the unwritten memoirs. Dr Shamsul Bahar bin Abdul Kadir, “Personal Message”, in Khadijah Md Khalid, Shakila Yacob and Sharifah Mariam Alhabshi, The Power of Deeds: The Untold Story of Abdul Kadir Shamsuddin (Petaling Jaya, MPH Group Publishing, 2020), pp. xix–xx. The September 1978 conversation is on p. xix. The surviving family notes and the decision to commission research are on p. xx.

8      Miri and the offshore industry. Suffian Mansor and colleagues, “Pembangunan Perlombongan Minyak di Sarawak: Kemajuan dan Cabaran (1910–1974)”. Sridevi Menon, “Dayaks in a Ledger”, International Labor and Working-Class History, section on the Miri and Seria oilfields. Shell Malaysia supplies the field chronology.  Sarawak history  ·  Labour history  ·  Field chronology

9      Politics, the states and the negotiating team. Tengku Razaleigh’s recollections, reported by The Edge. Tun Abdul Razak, Malaysian Investment Seminar, 27 October 1975, printed pp. 274–275. See also project Chapter 5 and Research Memorandum No. 1 on the administrative setting and the contributions of Razaleigh, Raja Mohar and Abdul Kadir.  Razaleigh’s account  ·  Razak’s address

10    The impasse and the early oil formula. World Bank, Malaysia: Second Plan Performance and Third Plan Issues, January 1976 draft, annex p. 35. Malaysia: New Perspectives on the Third Malaysia Plan, October 1977, annex 1, part A, paras. 1–2 and table 1. The two 100-unit illustrations use the simplified pre-tax allocation. The research-fund provision is in para. 2(c).  The interruption  ·  Terms and worked examples

11    Electricity, scholarships and trust in managers. The Power of Deeds, p. 191, on the engineering scholarships supported by Abdul Kadir and Abu Zarim, and pp. 192–193 on their respective responsibilities and Abdul Kadir’s confidence in Abu Zarim as a manager. The full name Abu Zarim Omar appears on p. 182.

12    The electricity institutions and Malaysian engineers. Tenaga Nasional Berhad’s history dates the Central Electricity Board to 1949 and records its initial 34 stations and the overseas posting of three Malaysian engineers in 1951. TNB’s annual reports give Raja Zainal’s 1964 appointment, the NEB name from 1965 and the TNB succession in 1990. Sarawak Energy’s Annual and Sustainability Report 2021 records the transfer to the Sarawak Electricity Supply Corporation under the 1962 Ordinance.  TNB history  ·  TNB chronology  ·  Sarawak Energy chronology

13    What electrification required of the NEB. World Bank, Project Performance Audit Report, Malaysia: Fourth Power Project (Loan 579-MA), 10 June 1975, completion report, para. 3.02, on 1968–74 demand, sales and the fuel-surcharge decision. For the three units, the transmission work, the US$20 million loan and the allocation of financing, see Fifth Power Project (Loan 700-MA), audit of 29 August 1979, completion report, paras. 1.01–1.03.  Fourth Power Project  ·  Fifth Power Project

14    The case for parliamentary scrutiny. Dewan Rakyat, 24 July 1974, cols. 2389–2392, Lim Kit Siang on electricity costs and rural connections, followed by his proposals for ratification of contracts, audit and parliamentary review. The proposals record an argument made during the bill’s passage.  Debate on scrutiny

15    The case made before the bill became law. Dewan Rakyat, 24 July 1974, cols. 2352–2356, Taib Mahmud on HIKMA, regional planning and the Prime Minister’s role, and cols. 2369–2376, Abdul Rahman Ya’kub speaking for Sarawak, including Bintulu, the Selantik road, the proposed chairman and his account of 1965. On 25 July, cols. 2475–2478 record Taib’s amendment to clause 5(2) and the bill’s third reading and passage by the House. See also the original Gazette in the note on the Malaysian-owned company.  24 July debate  ·  25 July amendment and passage

16    The corporate form and its founders. The Power of Deeds, pp. 197–199. Page 197 identifies Taib Mahmud’s HIKMA proposal, Razaleigh’s discussions with Razak, the legal drafters and Junus Sudin’s assignment. Page 198 discusses the Prime Minister’s powers and records a later assessment by Hassan Marican. Page 199 names the Ministry of Finance and gives RM10 million in issued capital.

17    Political authority and its limits. A. Krishnan, “The Legislative Framework for the Development of Petroleum in Malaysia”, Journal of Malaysian and Comparative Law 12 (1985), pp. 117–118 and n. 29. The note cites “Razak Taps the Pipeline”, Far Eastern Economic Review, 30 August 1974, p. 15. The Power of Deeds, pp. 198–199 and nn. 544, 547, attributes Hassan Marican’s later appraisal and Razak’s description of his chairman’s status. These accounts illuminate the reasoning and recollections surrounding the bill. The text of the statute and Taib’s speech establish the office and its powers.  Krishnan’s legal study

18    Recruitment, training and the early office. The Power of Deeds, pp. 206–208 (Razak, Abdul Kadir and recruitment), 210–211 (Yahaya Ibrahim, Ford Henderson, Rais Saniman, the Norway visit and Tony Lim), 212–213 (the returnees and the officers sharing industry reports) and 217 (Rastam’s recruitment of Anwarrudin). The authors identify interviews with Yahaya Ibrahim and Rais Saniman on p. 210. PETRONAS dates its education sponsorship to 1975.  Education sponsorship

19    The Sarawak delegation and the March instruments. Razaleigh described Rahman leading a team including state ministers at a Bar Council forum in March 2010. Amalina Anuar, ISEAS Perspective 2025/103, names Bujang as accompanying Rahman. A later account attributed to former Treasury official Nik Azmi instead describes Bujang signing at a ceremony. The corporate career record identifies Bujang as State Financial Secretary in 1971–84, then State Secretary in 1984–92. The Federal Court’s 2026 leave judgment, PETRONAS v Kerajaan Negeri Sarawak & Anor, paras. 5–8, records the federal vesting on 26 March 1975 and the Sarawak vesting and cash-payment agreements on 27 March. It identifies the parties by office or institution. The article gives the dates stated by the court and leaves the individual signature unassigned.  Razaleigh’s public account  ·  ISEAS study  ·  Former Treasury official’s account  ·  Bujang’s career  ·  Federal Court record

20    The states and the men who represented them. The Power of Deeds, pp. 203–204, on Razaleigh’s negotiations with the producing states and the Sabah agreement signed by Harris Salleh. Noorlina’s Scrapbook Collection, Telegrams and Telexes, vol. 1. Harris Salleh, chief minister of Sabah, to Puan Sri Zainab, leaf 17, telegram 542. Abdul Rahman Ya’kub and Datin Patinggi, Kuching, to Puan Sri Zainab and family, leaf 20, telegram 863. Both bear Kuala Lumpur telegraph-office stamps of 9 November 1978. For the date of the five per cent cash-payment agreement, see the explicit identification of the instrument by Second Finance Minister Nor Mohamed bin Yakcop in the Dewan Rakyat on 8 June 2004. He gave 14 June 1976. The biography and Shakila Yacob (p. 129) place the Sabah signing in August.  Minister’s reply on the Sabah agreement

21    Sarawak asks who negotiates and who measures the oil. Dewan Rakyat, 18 July 1974, question 1 and supplementaries, cols. 1757–1760. James Wong Kim Min, member for Miri–Subis, questioned Taib Mahmud on the continental shelf, the percentage still under negotiation, measurement of Shell production and Customs supervision. For the earlier exchange, see Dewan Rakyat, 30 January 1973, question 11 and supplementary, cols. 6168–6169, including Edmund Langgu anak Saga’s question, Taib Mahmud’s reply and Abdul Rahman Ya’kub’s intervention. Shakila Yacob points to this exchange on p. 128, n. 56 of the article cited in note 59.  Question and replies  ·  January 1973 exchange

22    Ting Ling Kiew secures a public account of the payment. Dewan Rakyat, 2 April 1975, written question 52, “Minyak dari Sarawak—Hasil”, cols. 3822–3824. The Prime Minister specified the payment base, dates, division between governments and 1974 production figures. Ting Ling Kiew was the member for Bintulu.  Prime Minister’s reply

23    Mukah and Bau–Lundu in the amendment debate. Dewan Rakyat, 7 April 1975, cols. 4259–4263, Latip bin Haji Dris on local exploration, a levy and participation in petroleum retailing. Cols. 4263–4264 and 4267 record Patrick Anek Uren’s request for representation on the board and the government’s answer about the National Petroleum Advisory Council.  Debate and ministerial reply

24    Baram asks whether the state share is sufficient. Dewan Rakyat, 11 November 1975, cols. 6940–6941. Luhat Wan spoke of the difficulties of travel within Sarawak when asking the federal government to increase the state’s share. His speech gives a constituency’s assessment of adequacy. The April written reply specifies the legal and financial basis of the payment.  Luhat Wan’s intervention

25    Indonesian advice and British concerns. The Power of Deeds, pp. 200–203. The account of Taib Mahmud’s discussions with Ibnu Sutowo draws on the authors’ October 2017 interview with Taib, p. 200, n. 549. For the Downing Street conversation see pp. 202–203, especially p. 202, n. 554, citing the UK National Archives, PREM 16/540, meeting of 14 April 1975.

26    How the oil companies read the management shares proposal. US Embassy Kuala Lumpur, dispatch 1975KUALA02079, on Shell’s meeting with Razaleigh on 15 April 1975. Dispatch 1975KUALA02167 records the government’s public explanation of licensing, management shares and exemptions. The accounts concern the 1975 proposal and its reception in the downstream businesses.  Meeting with Shell  ·  Public explanation

27    The chairman’s appointment and his negotiating position. Noorlina’s Scrapbook Collection, Newspaper Cuttings. “Kadir pengerusi baru Petronas”, leaves 29–30, handwritten date 30 September 1976. The continuation on leaf 30 gives 1 October as the effective date. Cheng Song Huat, report with the cropped headline “Minyak: Rundingan jalan …”, leaf 31, handwritten date 9 October 1976. The report names the three companies, the standard formula and the 15 November target. The mastheads are outside the surviving clippings. US Embassy Kuala Lumpur to the Department of State, “Chief Secretary to GOM May Be New Chairman of PETRONAS”, 12 March 1976, cable 1976KUALA01382, paras. 1–2, copy supplied by the author. Paragraph 1 relays the 10 March New Straits Times story. Paragraph 2 gives the embassy’s own assessment.

28    What had been agreed by 15 November 1976. Dewan Rakyat, 16 November 1976, Prime Minister Hussein Onn’s statement on production sharing, cols. 5416–5418. The statement names the four counterparties, reports agreement on the key terms, describes Raja Mohar’s consultations with the Prime Minister and distinguishes the outstanding contract details from the settlement already reached. The Ministry of Finance dates Raja Mohar’s service as Secretary-General to the Treasury to 1971–1972.  Hussein Onn’s statement  ·  Ministry of Finance officeholders

29    Finance and planning officers at the Exxon settlement. US Embassy Kuala Lumpur to US Department of State, 10 December 1976, “Petroleum: Exxon Signs Production Sharing Contract with Petronas”, cable 1976KUALA07077. It names PETRONAS finance director Ismail Hashim and G. K. Rama Iyer of the planning unit in the Prime Minister’s Department, and attributes the intended six-week timetable to Exxon’s Malaysia president.  Contemporary diplomatic dispatch

30    A proposal from the British Department of Energy. The Power of Deeds, p. 215 and n. 593. The authors describe Sir Jack Rampton’s February 1978 visit and cite his letter of 8 March to Abdul Kadir, Donald Hawley Papers, HAW 23/3/25, Palace Green Library, Durham. The account here follows the book’s reading of that letter.

31    Finance, legal work and personnel. The Power of Deeds, p. 208 on Junus Sudin, Ismail Hashim, Muri Muhammad and Rastam Hadi, and p. 211 on Wan Ismail Wan Mohd Salleh and Nik Saghir Nik Mohd Noor. Nik Saghir’s interviewee profile, pp. 306–307, records his work in tax and loan negotiations and his responsibility for PETRONAS’s early contracts with Esso and Shell. On Junus Sudin’s work on the corporate structure see The Power of Deeds, p. 197. Its account of early appointments on p. 208 differs from Shakila Yacob, p. 135 and table 1, which names Rastam Hadi as first managing director. The Business Times report of 2 August 1978 (note 33) identifies Rastam as managing director by that date. The order of the initial appointments remains open.

32    The marketing department and a New York correspondent. The Power of Deeds, p. 306, profile of Muri Muhammad, gives his earlier employers, the dates of the marketing department and his later leadership of MLNG. Noorlina’s Scrapbook Collection, Telegrams and Telexes, vol. 2, David Tobey, Philipp Brothers, New York, to Rastam Hadi, copy to Muri Muhammad, 9 November 1978, leaf 7 (received 11 November).

33    Malaysia LNG as it was taking shape. A. Kadir Jasin, “Work Moving Forward on Bintulu LNG Project”, Business Times, 2 August 1978, p. 1, reproduced in Dr Shamsul Bahar Abdul Kadir’s Malaysia LNG: Before the First Cargo. The report identifies the original shareholders, officers and work in progress. Tokyo Gas also records the incorporation date.  Buyer’s corporate profile, p. 3

34    From purchasing intent to the shipping terms. Dewan Rakyat, 24 March 1980, question 8, cols. 607–608, on the November 1979 confirmation of intent. Tokyo Gas and Tokyo Electric Power, “New LNG Purchase Contract Signed with Malaysia LNG Sdn. Bhd.”, 17 March 2003, pp. 1–3. The six-million-tonne figure belongs to the 1979 intent.  1980 parliamentary reply  ·  Buyers’ description of the contracts

35    Plant procurement and the port works. Suzanne Atar, A Rahman Tang Abdullah and Bilcher Bala, Jurnal Borneo Arkhailogia 3(2), 2018, citing the Sarawak assembly record of 4 December 1979, p. 14. JGC’s Bintulu project account describes the engineering work. JICA’s Bintulu port project summary lists the OECF loan, scope and December 1982 completion of those works.  Study and assembly reference  ·  Engineering record  ·  Port loan and works

36    Mitsubishi and the prospective buyers. Noorlina’s Scrapbook Collection, Telegrams and Telexes, vol. 2. Mitsubishi’s Bunichiro Tanabe, Yutaka Yamamoto and Keizaburo Yamada to Rastam Hadi, leaf 2, messages 88/9, 89/9 and 92/9. Hiyoshi Hama to Rastam, leaf 19, lower message 87/9. Masami Tajiri of Tokyo Electric Power, Takeo Murakami of Tokyo Gas and Gaishi Hiraiwa of Tokyo Electric Power to Rastam, leaves 15, 16 and 17 respectively. All are dated 9 November 1978 and stamped received 11 November.

37    What the bankers were told. US Embassy Kuala Lumpur, “Visit of Exim Bank Chairman”, cable 1978KUALA12153, 13 November 1978, paras. 1–4. The project estimate and competing credit options are those recorded during the visit. The cable identifies Chase as financial consultant.  Diplomatic cable

38    Correspondence from three banking centres. Noorlina’s Scrapbook Collection, Letters. John T. Olds, Morgan Guaranty Trust, Singapore, to Rastam Hadi, 9 November 1978, leaf 16 (received 13 November). Zainuddin Haji Din, Pertanian Baring Sanwa, Kuala Lumpur, to Rastam, 9 November, leaf 20 (received the same day). Telegrams and Telexes, vol. 2, Mamoru Sakai, Long-Term Credit Bank of Japan, Tokyo, to PETRONAS’s board of managing directors, 10 November, leaf 4 (received 11 November).

39    Three companies name their chairman. Noorlina’s Scrapbook Collection, Newspaper Cuttings. Joint condolence notices of the directors and staff of PETRONAS, Malaysia LNG Sdn. Bhd. and PETRONAS Carigali Sdn. Bhd. to Puan Sri Zainab and family, English on leaf 11 and Malay on leaf 13. November 1978. Neither clipping shows a publication date or masthead.

40    The ambassador’s two addressees. Noorlina’s Scrapbook Collection, Telegrams and Telexes, vol. 1, leaf 33. Datuk Lim Taik Choon, Malaysian Embassy in Tokyo, to Rastam Hadi and to Puan Sri Zainab, both on the same sheet, marked 10 November 1978. The PETRONAS receipt stamp is dated 11 November.

41    The two engineering companies write to different offices. Noorlina’s Scrapbook Collection, Telegrams and Telexes, vol. 2. Frank H. Shipman Jr, executive vice-president of Pullman Kellogg, Houston, to Rastam Hadi, PETRONAS, leaf 5. Yoshio Suzuki, president of JGC, Tokyo, to M. B. Hashim, managing director of Malaysia LNG, leaf 38. Both dated 9 November 1978, received 11 November.

42    Counterparts, a colleague and a consulting engineer. Noorlina’s Scrapbook Collection, Letters. Peter Baxendell, Shell Centre, London, to Prime Minister Hussein Onn, 8 November 1978, leaf 8. Charles A. Rose, Esso Malaysia Berhad, to Rastam Hadi, 9 November, leaf 21 (received that day). N. J. Cochrane, Sir William Halcrow & Partners, London, to PETRONAS’s managing director, 14 November, leaf 7. Telegrams and Telexes, vol. 1, Abdul Aziz Ahmad to Puan Sri Zainab, Innsbruck, 9 November, leaf 32 (received 11 November).

43    How often the advisory council met. Dewan Negara, 1 August 2024, written answer 29 by Minister of Economy Rafizi Ramli to Hussin bin Ismail. It gives 9 April 1975 as the first meeting under Raja Mohar, reports inactivity since 1995, and identifies Sabah and Sarawak representation on the National Energy Council in 2024.  Dewan Negara written reply

44    The operator at E11. PETRONAS, 7 January 2021. Its announcement records that PETRONAS Carigali assumed operatorship on 1 January, following 38 years of operation by Sarawak Shell.  E11 handover

45    Industrial gas on the peninsula. Fifth Malaysia Plan, chap. XVII, “Energy”, on the Terengganu customers. The Energy Commission’s Peninsular Malaysia Gas Industry Outlook 2019 explains how the first phase and subsequent trans-peninsular pipeline brought gas to industrial and power customers.  Fifth Malaysia Plan  ·  Energy Commission account

46    A Philippine witness and a Malaysian technical representative. Noorlina’s Scrapbook Collection, Telegrams and Telexes, vol. 2, Geronimo Velasco, Philippine National Oil Company, Manila, to PETRONAS, 10 November 1978, leaf 37, message P100155 (received 11 November). The Power of Deeds, p. 217 and pp. 290–291, on Anwarrudin’s recruitment and career. Page 291 identifies his ASCOPE technical committee service and his 1989–91 OPEC/non-OPEC work. ASEAN lists the founding declaration of 15 October 1975.  ASEAN record

47    A Malaysian shareholder in LNG Canada. PETRONAS, announcement of 7 July 2025, documenting the departure of its first LNG Canada cargo from Kitimat and its 25 per cent equity holding through North Montney LNG Limited Partnership.  PETRONAS announcement

48    What Parliament wanted petroleum to deliver. The Power of Deeds, pp. 208–210. On p. 209, nn. 573 and 575 cite the Dewan Rakyat proceedings of 7 November 1974, pp. 219 and 237–238, for Lee Lam Thye and Abdul Jalal Haji Abdul Bakar. For the training institute see pp. 209–210 and n. 576.

49    District information and rural development. The Power of Deeds, pp. 225–227, on the RED Book and the operations rooms. The authors identify Abdul Kadir among those who helped introduce the national operations room, p. 227. Their n. 616 leaves open the extent of his personal role in formulating the RED Book itself.

50    Public revenue and the uses of development spending. Fourth Malaysia Plan, 1981–1985, chap. 6, “Public Sector Programme and Its Financing”, especially printed pp. 71–74. RM24.94 billion is rounded nominal public development expenditure in 1976–80. Road and rural electrification totals cover 1971–80.  Fourth Malaysia Plan

51    PETRONAS’s 2025 payments and reinvestment. PETRONAS Group Financial Results Announcement for the year ended 31 December 2025, pp. 7–8. The presentation distinguishes group capital expenditure, dividends, taxes, resource payments and additional categories reported to governments and the National Trust Fund.  Financial and operational report

52    Where the trust fund’s money went. National Trust Fund, Annual Report 2022, tabled in Parliament. See “Utilisation of the Fund” and the breakdown at 31 December 2022 by vaccine acquisition and related expenditure. The report distinguishes the RM6 billion allocation from actual utilisation and discusses replenishment.  Fund report and audited figures

53    The fiscal outlook as at November 2026. Ministry of Finance Malaysia, Fiscal Outlook and Federal Government Revenue Estimates 2027, section 2, “Federal Government Revenue”. The figures for 2026 are revised estimates and those for 2027 are forecasts. The petroleum-related total already includes the PETRONAS dividend.  Federal revenue estimates

54    Gas commitments and the federal–Sarawak discussions. Sarawak Premier’s Department, 21 May 2025, and Dewan Rakyat written reply, 30 July 2025, question 63. PETRONAS’s statement of 12 January 2026 describes its court application. Premier Abang Johari’s own account of domestic supply, delivery and timing was published by The Edge on 5 November 2026. The Federal Court’s March leave decision and Bernama’s report on the two petitions on 24 September 2026 record the procedural position at those dates.  Sarawak statement  ·  Federal reply  ·  PETRONAS statement  ·  Premier’s interview  ·  March leave judgment  ·  September proceedings

55    Regional electricity, approvals and obligations. Singapore Energy Market Authority, “EMA Grants Conditional Approval to Sembcorp Utilities for 1.3GW of Electricity Imports”, 26 October 2026, paras. 1–3. The regulator identifies the sources, project partners and further requirements. PETRONAS records the May 2025 joint development agreement.  Regulator’s decision  ·  Malaysian partners’ announcement

56    The Jakarta visit. The author supplied the photograph, identified Haryono and provided the dates of the official visit. The Geological Society of Malaysia gives Abdul Kadir’s title in its 1978 obituary. Sejarah Perminyakan di Indonesia records Haryono’s term as President Director.  Geological Society obituary  ·  Indonesian petroleum history

57    Who signed for Exxon. The author’s caption identifies the PETRONAS Building as the venue. A wider view by Jabatan Penerangan Malaysia, held at Arkib Negara Malaysia (G.14716, accession 2001/0044182W), names J. G. Walvoord as Exxon’s president and R. W. Hensley as its corporate secretary. Both signed. A family notice for Zora Walvoord in the Corpus Christi Caller-Times, 25 April 2010, gives her husband’s full name as James Garrett Walvoord and records his posting to Malaysia. The archive spells the PETRONAS legal director’s name ‘Nik Shagir’. His former law partner Roger Tan gives the spelling used in the caption.  Arkib Negara Malaysia  ·  Walvoord family notice  ·  Roger Tan’s recollection

58    From Tapis to the Terengganu coast. D. N. K. Tan, “Oil and Gas”, section 16.0, dates the Tapis discovery to 1969 and first oil to March 1978. In the Dewan Rakyat on 28 March 1978, question 6, Hussein Onn described Esso’s contract and the state’s plans for the Kemaman supply base. On 18 October 1984, question 6, James Ongkili dated operations at the Kertih refinery to March 1983 and identified domestic and export sales. PETRONAS calls Kertih its first refinery. The author supplied the photograph, the date of the visit and the description of the site inspection.  Geological Society of Malaysia  ·  Parliament, March 1978  ·  Parliament, October 1984  ·  PETRONAS history

59    The Malaysians who calculated the negotiating terms. Shakila Yacob, “PETRONAS, Oil Money, and Malaysia’s National Sovereignty”, Journal of the Malaysian Branch of the Royal Asiatic Society, vol. 94, pt. 1, no. 320 (June 2021), pp. 119–144. On p. 131 and nn. 77–78 she identifies the task force and its modelling, drawing on Ismail Hashim, The Young Turks of PETRONAS (2004), pp. 31–33 and 80–86. The ratios the group examined were negotiating proposals. Note 10 gives the basis for the worked example of the agreed terms.  Journal article

60    The succession and the division of senior offices. Shakila Yacob, pp. 135–136, especially table 1, traces Abdullah Mohd Salleh’s tenure and the 1984 separation of the chairman’s and chief executive’s functions. US Embassy Kuala Lumpur, 9 January 1979, cable 1979KUALA00709, para. 2(a), records Abdullah’s move from Chief Secretary to PETRONAS. In his address for PETRONAS’s tenth anniversary on 25 August 1984, Mahathir Mohamad named Raja Mohar as chairman and Abdullah Salleh as president.  Contemporary appointment report  ·  Prime Minister’s anniversary address

61    Razaleigh’s announcement and the purpose of the settlement. Bernama dispatch reproduced by the US Embassy Kuala Lumpur to the US Department of State, “Razaleigh Resigns as Chairman of PETRONAS”, 29 September 1976, telegram 1976KUALA05574, para. 1. The dispatch gives the timing of the handover, Razaleigh’s assessment of Shell and the uses he envisaged for petroleum revenue. The telegram also records Raja Mohar’s designation as mediator. Compare the clipping dated 30 September in Noorlina’s collection (note 27). Shakila Yacob cites the telegram on pp. 131–132, nn. 79 and 86.  September telegram

62    Syed Nahar’s conversation with Exxon. US Embassy Kuala Lumpur to the US Secretary of State, “Deputy Prime Minister Becoming Involved in PETRONAS-Exxon Negotiations”, 15 October 1976, telegram 1976KUALA05959, message text pp. 1–2, copy supplied by the author. An embassy officer attended the 15 October meeting. Syed Nahar’s account of the prospective offer preceded agreement on its terms. A separate meeting with Mahathir was scheduled for 18 October. Its outcome is outside the period covered by this telegram. For Walvoord at the December signing, see note 57.  US National Archives guide to the telegram series